Preparation of Users Requirement Specification (URS) is done for Total Utilities. On the basis of URS calculation of the Utility machine and Equipment capacity is Identified for utility equipment like Steam, Purified water, Water for Injection, Compress Air, Vacuum etc.
Preparation of Drawings, Specifications and Bill of Quantity for following required utility:
Steam (Both Pure and Commercial)
Purified Water / WFI Generation and distribution System
Central Vacuum system, Dust Extraction system.
Compressed Air System (Lubricated and Oil free)
Lab Gas System for Instruments.
CIP System, SIP System for production machines.
Fire Fighting System
Checking & approving of working drawing of vendor / contractor.